Snow Shoe Rails to Trails has been working on the trail and trailhead in preparation for the Carns/SSRT Pig Roast to be held Saturday, September 25, 2021.Cameron Fye and Larry Mayes graded the trail from Clarence to Rock Run Bridge. Andy Basalla leveled the Gillentown Trailhead. Best Lines, Bob Moorehead, delivered a 13 ton Roller for Andy Basalla to roll in the trailhead, the graded trail and entrance road to trailhead. Andy said such a nice machine to operate when we had so much to do. Andy and Cameron worked into the dark to finish what we needed done. Gary Halsnik, Maintenance Director stopped by to check out how everything was going. We want to thank Jim Vangor for helping to trim some of the overhanging limbs on the trail and a thank you to President Trilby Mayes for coming out and checking out the maintenance too. Great team effort everyone!