Thursday, January 15, 2015

SSRT Rules and Regulations Revision

NOTICE: SSRT Rules and Regulations have been revised as of January 14, 2015 with the addition of rule number 14:

14. All fires must be in self contained unit with bottom. Place ashes in designated area. Violators will lose their membership to the SSRTA.

Remember, it is better to be SAFE than Sorry!
Thank you,
SSRT Officers

Monday, January 12, 2015

12th Annual Winter Dinner Ride

On Saturday, January 3, 2015, Snow Shoe Rails to Trails & Best Line Powersports held it's 12th Annual Winter Dinner Ride. The weather was cold along with freezing rain in the early morning. However, that didn't prevent some 116 dedicated SSRT Members from attending the Roast Beef Dinner. The meal was prepared by Ruth Martin, Trilby Mayes, Mark Watson. Jim Verost added a large pot of his exceptional Chili. It was fantastic as usual!! George Holt handled the SSRT applications while Lyn & Shawn Timblin handled the meal/door prizes. rip offs etc. Shawn Timblin won the 50/50 and donated it back to the club. We also want to thank Lyn Timblim for donating the rip offs. Andy Basalla won $150.00 on the rip offs and donated $50.00 back to the SSRT.
We had an added attraction to the Winter Dinner Ride this year as CMATVA/Best Line Powersports held it's first Dice Run in conjunction with the Winter Dinner Ride. They had 58 people sign up for the Dice Run.
We want to thank our Corporate Sponsor Best Line Powersports, Mike Getz, Fred, JP for their continued support of this event and the trail.
We also want to thank the Centre Daily Times for covering the event and especially reporter Brittany Milazzo for great article. We also want to thank the Centre County Probation Office for the help preparing the center before, during and after the event. On Friday, January 2, we also collected a pickup load of trash along the Snow Shoe Township highways.

The SSRT would like to thank Beth Watson and the Moshannon Community Center Organization for their help before, during and after the event!


View photos from this event, click here.

Monday, January 5, 2015

Bloody Skillet Trail Reopening Sunday, January 11th

TRAIL NOTICE:
The Bloody Skillet ATV Trail will reopen on Sunday, January 11th. The trail will close again on Monday morning, March 30th, 2015. Then it will reopen again for the Memorial Day opener on Friday, May 22nd, 2015.


Sunday, January 4, 2015

CDT Newspaper Article: Riders go off road for a cause


Snow shoe Rails to Trails Association | Dice run fundraiser
Riders go off road for a cause

ead more here: http://www.centredaily.com/2015/01/03/4536770/rides-go-off-road-for-a-cause.html#storylink=cpy
Article in the CDT about SSRT: http://www.centredaily.com/2015/01/03/4536770/riders-go-off-road-for-a-cause.html

SSRT03 

 

2014 CMATVA Tour For Elk Ride Episode On TomBob Outdoors TV

SSRT Members,
Some of you took part in the 2014 Central Mountains ATV Tour for Elk ride in Benezette on November 8th and 9th. TomBob Outdoors LLC. was there filming the ride. This episode will air on Sunday January 11th on the following channels:
Cable TV: Destination America Channel, channel 113 or 873 at 7:00 am.
Dish: Pursuit Channel Sundays at 4:00pm, Wednesdays at 10:30pm, Fridays at 4:00pm
ABC 23 Johnstown, Pa. Sunday at 7:30am


Tuesday, December 23, 2014

Snowmobiling on the SSRT

SSRT visitors are permitted to run their snowmobiles after the last day of deer season in December to April 1, as long as there is enough snow cover.
There are several access points to Black Moshannon State Park from our trail system.
SSRT membership is required as well as proper registration and insurance.
Check local snowmobile trail conditions and maps here: http://www.dcnr.state.pa.us/statep…/recreation/snowmobiling/

Thursday, December 18, 2014

New Corporate Sponsor Sign at Gillentown Trailhead

"Lundberg Paving & Trucking LLC" has a new corporate sponsor sign at our Gillentown Trailhead.










Monday, December 15, 2014

2015 SSRT Membership Renewals Are Due

2015 SSRT Membership Renewals Are Due

Members should have received a 2015 Membership Renewal Form with their newsletter recently.

Please fill out a new application with any updates and send to Snow Shoe Rails to Trails, P.O. Box 314, Clarence, PA 16829.

Remember to attach a copy of your insurance and registration information to your application. State recipocating with PA must also present a copy of their state's registration and insurance information. The membership year runs from January to December each year.

Motorized Users - Membership will be $20.00 per each motorized unit -" No family discount"

Download 2015 Membership Form here: http://www.ssrt.org/2015MembershipForm.doc

2015 SSRT Christmas Card Photo Contest



2015 SSRT Christmas Card Photo Contest

If you see something that you think would make a nice photo for the 2015 SSRT Christmas Card, please email it to Trilby Mayes at cooper_2356@yahoo.com

The pictures must be taken on the Snow Shoe Rails to Trails and sent in my March 15, 2015. If your picture is chosen to be used on the Christmas Cards sent to our corporate sponsors, you will receive a SSRT hoodie, sized to fit. Thank you!

Wednesday, December 10, 2014

Trail Notices

TRAIL NOTICES

Kato Bridge Replacement Project:
The Snow Shoe Township Supervisors have advised the SSRT that the first phase of the project was awarded to a contractor. The contractor is responsible for tearing down the bridge and repairing concrete pillars. Phase two of the project to replace the bridge will be placed out for bids after phase one is completed.

Gas Line Project on Kato Road:
Snow Shoe Supervisors have alerted the SSRT that a new gas line will be laid on parts of the Kato Road starting in 2015. We have been advised that there may be some delays and possibly a day or so of road closings at various times during this project. But road closings will be kept to a minimal and the SSRT will be notified of road closings so we can post them on our website and facebook page. We were initially advised that there will be no weekend work. But, keep checking our website and we will try to keep you abreast of the project.

Gas Line Crossing Near Clarence Gate:
A new gas line will be installed this next summer about 100 yards up the trail from the Clarence Gate towards the Number 10 Gate. They will be crossing the trail only. We will receive a two week notice prior to any digging and the trail should only be shut down for a short time. Of course that is if there are no problems with installation of the lines etc. Signs will be placed on both ends of the ditch area being dug to alert trail users. Then a fence will be installed on both sides of the trail to stop unwanted access. This should only be a day or two job because the gas company is only crossing the trail. Keep up to date with projects by checking our website www.ssrt.org and our facebook page. Thank you all for your patience during all of this construction. The construction project will not take place on the weekend.