Thursday, April 6, 2017

Work Detail 04-05-2017 Drainage Pipe Install

Fred Lingle, Gary Halsnick, Marlin Luse and Larry Mayes planned out a work detail on the best day of the week to install 30ft of drainage pipe. The pipe was installed near the gate by the pavilion. The ditch leading to the pipe was also lined. Some time was used to level off the stone/snow balls still remaining in the parking lot and some time was used to fill in the water line ditch where it has been sinking. Most of the upper side of the parking lot is in really good shape. We still have a soft spot in the center where the ditch was installed - this will be fixed over the next several weeks. 

View photos from this project, click here.