The Snow Shoe Rails to Trails has the following update about the Kato Road from Snow Shoe Township Supervisors.
Pipe Line Project
The contractor has advised they are hoping to be completed with the pipe line on the Kato Road by Labor Day Weekend. However, if they are not done with the project, the Kato Road will be Open Friday September 4, 2015 through Monday, September 7
for atv/utv use.
So, those of you wanting access from Gillentown Trailhead to the Bloody Skillet will have access.
Kato Bridge Update
The Kato Bridge is being built and will eventually be delivered to the bridge installation site. The installation of the bridge will be bid separately and estimated to be installed by the first weeks of November 2015.
Thank you all for your patience and cooperation with the Pipe Line & Kato Bridge Projects.
Snow Shoe Rails to Trail Officers